Upgrade mechanism

This is an image of the dependencies structure. Use it for a better understanding.

Contracts and interfaces

Ownable

Ownable is a contract that stores the address of its master at the storage slot with index keccak256("master").

UpgradeableMaster

UpgradeableMaster is an interface that controls the upgrade flow through the phases of upgrade (this will be explained below)

Upgradeable

Upgradeable is an interface of contract, which knows its target (address of implementation). The target can be changed by calling upgradeTarget method.

Proxy

Proxy is an interim contract between the caller and the real implementation of the contract.

contract Proxy is Upgradeable, UpgradeableMaster, Ownable.

Note: storage of this contract will be a context in which all processes of the target will work. Proxy will store address of its target at the storage slot with index keccak256("target").

As Proxy implements Upgradeable, it can change its target, but only master can do it.

Proxy have a fallback function that performs a delegatecall to the contract implementation and return whatever the implementation call returns

There is some type of calls that Proxy must intercept without uncheck submitting to processing to a fallback function: calling the initialize function (in the right way this function will be called from proxy contract directly) and functions of UpgradeableMaster interface (that is a reason why Proxy implements it).

UpgradeGatekeeper

UpgradeGatekeeper is a contract that will manage the upgrade process. It is needed to prevent upgrading rollup contracts by the master in one function call.

Deploying and upgrade process

Deploying

When a target contract is deployed on the network operator will deploy the Proxy contract. Parameters of the constructor: address of deployed target contract in the network and its initialization parameters.

When all needed Proxy contracts are deployed, one of them (which must implements UpgradeableMaster interface) will act as a parameter of constructor of UpgradeGatekeeper (it will names "mainContract").

The last part of the deploy process is to transfer all proxy contracts under control of the gatekeeper. This should be done by calling several times addUpgradeable function.

So, step-by-step deploy process:

  1. Deploy targets for all proxies.
  2. Deploy proxies with needed target addresses and initialization parameters.
  3. Deploy UpgradeGatekeeper passing the address of the main proxy as a parameter.
  4. Transfer mastership of all proxies to the UpgradeGatekeeper.
  5. Add all proxies to the gatekeeper's list by calling UpgradeGatekeeper.addUpgradeable() function for each of them.

Upgrade process

There is three phases of upgrade which described in UpgradeGatekeeper:

Phase Description
Idle This is a phase when there are no upgrades to process.
NoticePeriod This phase starts when master of gatekeeper calls startUpgrade function. The purpose of this phase is to give all users of the rollup contract an opportunity to withdraw funds to the ethereum network before upgrading the target. The transition to the next phase can be done after at least upgradeNoticePeriod seconds from the start of this phase. upgradeNoticePeriod is a value which defines by the "mainContract".
Preparation This is the final phase. During this phase, master can call finishUpgrade function, which upgrades targets in proxies. One of the most important checks inside this function is enforcing that the mainContract is ready for the upgrade.

So, step-by-step upgrade process:

  1. Deploy new targets for proxies that would be upgraded.
  2. Call startUpgrade with addresses of these targets (and zeroes for proxies that shouldn't be upgraded).
  3. Wait for the end of the notice period.
  4. Call startPreparation.
  5. Wait until all open priority operations will be processed.
  6. Call finishUpgrade with needed targets initialization parameters.

NOTE: In case of some error or bug in code, there is an option to cancel the upgrade before finishing by calling cancelUpgrade function.

Current Franklin contract upgrade specification or "How notice period works"

UPGRADE_NOTICE_PERIOD defined in Config.sol as 1 week.

Franklin makes a decision that upgrade can be finished when both of these conditions is true:

  1. exodus mode is not activated
  2. number of open priority requests equals to zero.

To prevent rollup from spamming of priority requests, during preparation lock period contract will not add new priority requests. This period starts from the notification from the gatekeeper about the start of preparation status of upgrade and ends when the upgrade finishes, or after UPGRADE_PREPARATION_LOCK_PERIOD seconds from its start.