Author: Christian Muise Project: Flow Shop Scheduler Requirements: Python -{ Flow Shop Scheduling }- The flow shop scheduling problem is a well-studied optimization problem in which we must determine the processing time for various tasks on a set of machines. In particular, every flow shop problem consists of n machines and m jobs. Each job is made up of exactly n tasks, and we can assume that the ith task of a job must use machine i and requires a predetermined amount of processing time. Further, the order of the tasks for any given job should follow the order of the machines available (i.e., the first task uses machine 1, and so on) -- for a given job, task i must be completed prior to the start of task i+1. The final restriction is that no two tasks can be processed on a machine at a given time. The objective in flow shop scheduling is to minimize the total time it takes to process all of the tasks from every job to completion. This objective is typically referred to as the 'makespan'. The general problem has many applications, but is most related to optimizing production facilities for the construction of various commercial products. Because the order of tasks within a job is predetermined, a solution to the flowshop scheduling problem can be represented as a permutation of the jobs. The order of jobs processed on a machine will be the same for every machine, and given a permutation, a task for machine i in job j is scheduled to be the latest of the following two possibilities: 1) The completion of the task for machine i in job j-1 (i.e., the most recent task on the same machine), or 2) The completion of the task for machine i-1 in job j (i.e., the most recent task on the same job) Due to the simple form of the problem, any permutation of jobs is a valid solution to the problem, and the optimal solution will correspond to some permutation. We thus search for improved solutions by changing the permutation of jobs and measuring the corresponding makespan. -{ Implementation }- This directory holds a basic implementation of a flow shop scheduler that parses a flow shop problem from a standard benchmark set, solves it heuristically, and then displays the resulting schedule. A key feature of the solver is a dynamic selection of the various search strategies available that attempts to give preference to those strategies that have worked well in the past. -{ Extra Resources }- A wonderful website to visually see how flow shop scheduling works: * http://posh-wolf.herokuapp.com/ More information on the flow shop scheduling (and related) problems can be found on wikipedia: * http://en.wikipedia.org/wiki/Flow_shop_scheduling