You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Currently the maximize function balances production for the highest number if all outputs must be the same amount/minute.
However if I could produce more of a resource at no cost later down the line it would be nice to know what that limit is and how many buildings it would need.
Example: a factory has 30 available iron and 200 available caterium, If I tell that factory to output max iron plates and max quickwire, I wouldn't want to see the calculation for producing 20 quickwire, I would want to see the calculation for producing 1000 quickwire.
I can imagine the logical difficulty in implementing such a feature but I feel that it should be possible to do at least to some extent.
The text was updated successfully, but these errors were encountered:
Currently the maximize function balances production for the highest number if all outputs must be the same amount/minute.
However if I could produce more of a resource at no cost later down the line it would be nice to know what that limit is and how many buildings it would need.
Example: a factory has 30 available iron and 200 available caterium, If I tell that factory to output max iron plates and max quickwire, I wouldn't want to see the calculation for producing 20 quickwire, I would want to see the calculation for producing 1000 quickwire.
I can imagine the logical difficulty in implementing such a feature but I feel that it should be possible to do at least to some extent.
The text was updated successfully, but these errors were encountered: