Notifications
You must be signed in to change notification settings - Fork 45
/
calcCapacityNuclear.R
72 lines (66 loc) · 4.1 KB
/
calcCapacityNuclear.R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
calcCapacityNuclear <- function() {
### overall philosophy:
## currently under construction goes online over the 5-year long 2020 timestep
## 90% of planned and 60% of proposed plants can come online in 2025 or 2030 timestep
## this corresponds well with maximum to be expected capacities for India and China
## China target 120-150 GW in 2030 (https://af.reuters.com/article/africaTech/idAFL3N16M3QX)
## India 63 GW in 2032 (though pre-Fukushima) (https://economictimes.indiatimes.com/industry/energy/power/india-eyeing-63000-mw-nuclear-power-capacity-by-2032-npcil/articleshow/6730724.cms)
#additional assumption: gross-net losses vary between 3 (Shin-Kori Unit 3)- 12 (Fuqing Unit 5) %, so 5% seems good assumption:
grossnet = 1.05
x <- readSource("IAEA")
out <- new.magpie(getRegions(x),c(2015,2020,2025,2030),"tnrs")
# allocate data and convert from MW into TW
#total capacity in 2015: snapshot of operable reactors in early 2016
out[,2015,] <- setYears(x[,2016,"REACTORS OPERABLE (MWe net)"] / 1000000,2015)
#total capacity addition for next 5 years: under construction + plants that came online between early 2016 and August 2018
out[,2020,] <- ( 0.7*setYears(x[,2020,"REACTORS UNDER CONSTRUCTION (MWe gross)"]/grossnet,2020)
+ setYears(x[,2020,"REACTORS OPERABLE (MWe net)"],NULL)
- setYears(x[,2016,"REACTORS OPERABLE (MWe net)"],NULL)) / 1000000
#maximum capacity addition for 5 years in 2025 period: 40% of planned and 30% of proposed, + 10% of 2015 to represent extensions
# out[,2025,] <- (
# 0.5*setYears(x[,2018,"REACTORS PLANNED (MWe gross)"]/grossnet,2025)
# + 0.3*setYears(x[,2018,"REACTORS PROPOSED (MWe gross)"]/grossnet,NULL)
# + 0.1*setYears(x[,2016,"REACTORS OPERABLE (MWe net)"],NULL)) / 1000000
out[,2025,] <- ( 0.3*setYears(x[,2020,"REACTORS UNDER CONSTRUCTION (MWe gross)"]/grossnet,2025)
+0.4*setYears(x[,2020,"REACTORS PLANNED (MWe gross)"]/grossnet,NULL)
+ 0.3*setYears(x[,2020,"REACTORS PROPOSED (MWe gross)"]/grossnet,NULL)
+ 0.1*setYears(x[,2016,"REACTORS OPERABLE (MWe net)"],NULL)) / 1000000
#maximum capacity addition for 5 years in 2025 period: 60% of planned and 70% of proposed, + 10% of 2015 to represent extensions
out[,2030,] <- (
0.6*setYears(x[,2020,"REACTORS PLANNED (MWe gross)"]/grossnet,2030)
+ 0.7*setYears(x[,2020,"REACTORS PROPOSED (MWe gross)"]/grossnet,NULL)
+ 0.1*setYears(x[,2016,"REACTORS OPERABLE (MWe net)"],NULL)) / 1000000
#special treatment for countries in the list (considering last political decisions)
# out["VNM",2025,] <- 0 #Vietnam has paused the nuclear program, so first operation definitely not earlier
#than 2028 http://www.world-nuclear.org/information-library/country-profiles/countries-t-z/vietnam.aspx
#special treatment to avoid infeasibility and open nuclear potential for Africa
#all countries not in the list of proposed plants, but rated as "Developing plans" can have a 500MW in 2025 and 2GW in 2030 periods
# http://www.world-nuclear.org/information-library/country-profiles/others/emerging-nuclear-energy-countries.aspx
# Israel, Nigeria, Kenya, Laos, Malaysia, Morocco, Algeria
#out["ISR",2025,] <- 0.0005
out["NGA",2025,] <- 0.0005
out["KEN",2025,] <- 0.0005
out["LAO",2025,] <- 0.0005
#out["MYS",2025,] <- 0.0005
out["MAR",2025,] <- 0.0005
out["DZA",2025,] <- 0.0005
out["PHL",2025,] <- 0.0005
out["GHA",2025,] <- 0.0005
out["RWA",2025,] <- 0.0005
out["ETH",2025,] <- 0.0005
#out["ISR",2030,] <- 0.002
out["NGA",2030,] <- 0.002
out["KEN",2030,] <- 0.002
out["LAO",2030,] <- 0.002
#out["MYS",2030,] <- 0.002
out["MAR",2030,] <- 0.002
out["DZA",2030,] <- 0.002
out["PHL",2030,] <- 0.002
out["GHA",2030,] <-0.002
out["RWA",2030,] <-0.002
out["ETH",2030,] <- 0.002
return(list(x = out,
weight = NULL,
unit = "TW",
description = "capacity of operating nuclear plants in 2015, fixed additions for 5-year period 2020, and upper limits on additions for 5-year periods 2025 and 2030"))
}