Skip to content

Fix test inconsistencies #321

Fix test inconsistencies

Fix test inconsistencies #321

Triggered via push October 25, 2024 09:59
Status Failure
Total duration 55s
Artifacts

erlang.yml

on: push
Matrix: build

Annotations

3 errors
build (25, 3.24)
Process completed with exit code 1.
build (26, 3.24)
The job was canceled because "_25_3_24" failed.
build (26, 3.24)
The operation was canceled.