Skip to content

Commit

Permalink
Browse files Browse the repository at this point in the history
  • Loading branch information
alexeyza committed Aug 8, 2014
1 parent bae11f6 commit 940b0c9
Show file tree
Hide file tree
Showing 4 changed files with 13 additions and 10 deletions.
2 changes: 1 addition & 1 deletion final submission.md
Original file line number Diff line number Diff line change
Expand Up @@ -25,4 +25,4 @@ Give special attention to usability issues, look & feel and simplicity.
6. Documentation (is it useful for users/developers)

Good luck,
Yossi, Misha, Yaniv and Alexey
Peggy, Cliff, Arie, Ian and Alexey
5 changes: 4 additions & 1 deletion milestone 1 - proof of concept.md
Original file line number Diff line number Diff line change
Expand Up @@ -59,4 +59,7 @@ Prepare a 10 minute presentation:
4. Demonstrating an interesting, self contained, primary use case of your application.
5. Good presentation (simple, clear, focused, time-framed, sincere).

If you have any questions please do not wait for the milestone meeting, use email: [[email protected]](mailto:[email protected])
If you have any questions please do not wait for the milestone meeting, use email: [[email protected]](mailto:[email protected])

Good luck,
Peggy, Cliff, Arie, Ian and Alexey
14 changes: 7 additions & 7 deletions milestone 2 - release candidate.md
Original file line number Diff line number Diff line change
@@ -1,9 +1,9 @@
#Milestone 2 - Release Candidate

For the second milestone (Monday, 31/12/2012) you are required to show progress based on the feedback you've received from the workshop staff at Milestone 1.
For the second milestone (Monday, 31/12/2012) you are required to show progress based on the feedback you've received from the staff at Milestone 1.

Please provide a full demonstration (**6 minutes**) of using your product in various scenarios. The demonstration should encompass your top features, and **highlight** new features or changes made since Milestone 1.
You should also be prepared to talk about your development process, in case you would be asked to (what is your plan for the next Milestone ? how long do you expect the work would take? how did you split the work? what was easy? what was difficult? why?).
You should also be prepared to talk about your development process, in case you would be asked to (what is your plan for the next Milestone? how long do you expect the work would take? how did you split the work? what was easy? what was difficult? why?).

If you are using a power point presentation, use **no more than 3 slides** altogether (including cover slide!)

Expand All @@ -14,18 +14,18 @@ Some general advice:
- If you are demonstrating social features of your application, or any other features that require prior preparations - please prepare them in advance! (e.g. creating social networks of several users).
- It is also advised to rehearse your presentation so it will flow nicely (For example: make sure you could demonstrate different users simultaneously - using different browsers for example)

You are required to provide in your Google code website a link to your running application (App-Engine website or a download link to an Android apk file). In addition provide instructions on how to use your application and how to install it (if installation is needed).
You are required to provide in your project page (on GitHub) a link to your live application (App-Engine website or a download link to an Android apk file). In addition provide instructions on how to use your application and how to install it (if installation is needed).

**Important note:** Full grading for Milestone 2 (25 points) will be given for teams that would successfully show:
**Important note:** Full grading for Milestone 2 (25 points) will be given for teams that will successfully show:

1. Focusing on primary use case and taking into account our feedback (sent by email for every team).
2. Following the project plan while adapting dynamically.
3. Continuously working along the semester (tip: put on the project site a report with all the time spent on the project by each of the team members. You are advised to update this report after every programming session).
3. Continuously working along the semester.
4. Demonstrating an interesting, self contained, useful and live application.
5. Providing a link to a live application.
6. Good presentation (simple, clear, focused, time-framed, sincere)

If you have any questions or comments please do not wait for the milestone meeting, use email: taugadgets@gmail.com
If you have any questions or comments please do not wait for the milestone meeting, use email: [alexeyza@uvic.com](mailto:[email protected])

Good luck,
Yossi, Niv, Misha, Alexey and Shir
Peggy, Cliff, Arie, Ian and Alexey
2 changes: 1 addition & 1 deletion milestone 3 - public beta.md
Original file line number Diff line number Diff line change
Expand Up @@ -46,4 +46,4 @@ For Milestone 3 you required to provide a link to a page which will include inst
If you have any questions or comments please do not wait for the milestone meeting, use email: [[email protected]]()

Good luck,
Yossi, Misha, Yaniv, Alexey and Shir
Peggy, Cliff, Arie, Ian and Alexey

0 comments on commit 940b0c9

Please sign in to comment.