Skip to content

Delete TODO now that we have q8_0. #22

Delete TODO now that we have q8_0.

Delete TODO now that we have q8_0. #22

Triggered via push October 5, 2023 22:19
Status Failure
Total duration 2m 42s
Artifacts

docker.yml

on: push
Matrix: Push Docker image to Docker Hub
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Push Docker image to Docker Hub (light, .devops/main.Dockerfile, linux/amd64,linux/arm64)
buildx failed with: ERROR: failed to solve: process "/bin/sh -c make" did not complete successfully: exit code: 2
Push Docker image to Docker Hub (full-cuda, .devops/full-cuda.Dockerfile, linux/amd64)
The job was canceled because "light__devops_main_Docker" failed.
Push Docker image to Docker Hub (full, .devops/full.Dockerfile, linux/amd64,linux/arm64)
The job was canceled because "light__devops_main_Docker" failed.
Push Docker image to Docker Hub (light-cuda, .devops/main-cuda.Dockerfile, linux/amd64)
The job was canceled because "light__devops_main_Docker" failed.
Push Docker image to Docker Hub (light-rocm, .devops/main-rocm.Dockerfile, linux/amd64,linux/arm64)
The job was canceled because "light__devops_main_Docker" failed.
Push Docker image to Docker Hub (full-rocm, .devops/full-rocm.Dockerfile, linux/amd64,linux/arm64)
The job was canceled because "light__devops_main_Docker" failed.